TISCO 8" Pre Galvanized Steel Pipes 270g/M2 Zinc Coated Pipe

Place of Origin CHINA
Brand Name TISCO
Certification ISO,SGS
Model Number Q195 Q235 Q355
Minimum Order Quantity 3 tons
Price negotiable
Packaging Details Standard export packing (waterproof paper + steel rings), or as your requirement
Delivery Time ship within 10 days after received the advance
Payment Terms T/T, L/C, Western Union
Supply Ability 3000 tons per month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Galvanized Iron Pipe Standard AISI, ASTM
Grade Q195 Q235 Q355 Thickness 0.5-2.8mm
Width 20mm-219mm,as Your Request Length 1000-7000mm,as Your Request
Technic Cold Rolled Finish BA/2B/NO.1/NO.4
Tolerance ±1 Application Chemical Industry,electrical Appliances, Automotive, Aerospace,etc
High Light

TISCO 8" pre galvanized steel pipes zinc coated

,

TISCO 8" zinc coated pre galvanized steel pipes

,

TISCO 8" 270g/m2 zinc coated pipe

Leave a Message
Product Description

TISCO Building Material ASTM Pre Galvanized Steel Pipe 0.5mm - 2.8mm

Out Diameter
1/2" -8" (20mm-219mm)
Wall Thickness
0.5mm - 2.8mm
Pipe Length
0.5m~7.2m or Customerized
Zinc Coating
40g/m2 - 270g/m2 , 6μm~52μm
Processing
Cutting,Bending,Bevelded,Threading with coupler,Painting
 
 
 
Product Show
TISCO 8" Pre Galvanized Steel Pipes 270g/M2 Zinc Coated Pipe 0
 
TISCO 8" Pre Galvanized Steel Pipes 270g/M2 Zinc Coated Pipe 1
TISCO 8" Pre Galvanized Steel Pipes 270g/M2 Zinc Coated Pipe 2
 
 
 
Packaging&Shipping
TISCO 8" Pre Galvanized Steel Pipes 270g/M2 Zinc Coated Pipe 3
 
 
Inspection
TISCO 8" Pre Galvanized Steel Pipes 270g/M2 Zinc Coated Pipe 4
 
 
Application
TISCO 8" Pre Galvanized Steel Pipes 270g/M2 Zinc Coated Pipe 5

 

 

 
FAQ
 
Q1: Are you a factory or trading company?
A1: We are a Chinese manufacture of steel pipes with both factories and trading companies.
 
Q2.How can you ensure the quality of your product?
A2.All products have to go through three checks in the whole manufacturing process,it includes production,cutting sheets and the packing.
 
Q3.What is your delivery time and the supply ability?
A3.The delivery time normally within 15~20working days,we can supply about 15,000tons every month.
 
Q4.What kind of equipment in your factory?
A4.Our factory have advanced five-eighth roller rolling,cold rolling production equipment on the roll,advanced processing and testing equipment,which makes our product better quality with efficiency.
 
Q5.About the complaint,quality problem,etc aftersales service,how do you handle it?
A5.We will have certain colleague to follow our order accordingly for each order with professional after-sales service. If any claim happen, we will take our responsibility and compensate as per contract. For better serve our client, we'll keep tracing feedback of our products from clients and that's what make us different from other suppliers. We're customer care enterprise.